Kostal_
Сonstruction of a plant for the production of mechatronic products
The construction project of the mechatronic production plant was developed by Egis Ertle Engineering for “Kostal Ukraine” LLC. According to the project, a new plant was planned to be built on a plot of land within the boundaries of Dudarkiv village council, Boryspil district, Kyiv region.
The project included the construction of the main production areas and administrative premises:
- plastic injection molding workshop
- surface treatment workshop
- circuit board surface mounting (SMT – Surface Mount Technology)
- assembly shop
- storage facilities
- premises for mechanical tests and quality control
- workshop and facilities for engineering support of the facility
- administrative and household premises
Know more