The construction project of the alternative energy facility is aimed at the processing of biomass into biogas and the production of electrical and thermal energy. The capacity of the biogas plant is 5,852,000 m3/year to provide electrical energy with a capacity of 1,500 kW from 27,500 t/h of corn silage.

Egis Ertle Engineering team performed a full range of services at all stages of the project: from Design development to Working Documentation and designer’s supervision. In partnership with a German company that is a world leader in the field of engineering and construction of biogas plants, we jointly develop similar projects around the world. Our cooperation includes responsibility for making strategic decisions and guaranteeing the accuracy of calculations to achieve the planned capacity of the station.