Construction of the Peregyn wind power plant

Back

Clear Energy

August 6, 2024

2 minutes

The Egis Ertle Engineering company carried out design work on the construction of a wind power plant on the territory of the Lypovytsk and Pereginsk village councils of the Ivano-Frankivsk region. The project included the development of pre-design proposals and the Design stage (P), aimed at ensuring efficient and ecological energy production.

Main characteristics:

  • Number of wind generators: 27 units
  • Capacity: 75 MW
  • Infrastructure: cable lines, power lines and transformer substations
  • Technologies: use of advanced technologies from a leading manufacturer of wind turbines

Advantages of the project:

  • Efficiency of energy saving: Thanks to the implementation of modern technologies, the project is aimed at maximum conservation of resources
  • Modern materials: high-quality and innovative materials ensure the durability and reliability of the wind power plant
  • Environmental friendliness: The wind power plant reduces greenhouse gas emissions, which has a positive effect on the environment and contributes to the sustainable development of the region

Contribution to the development of Ivano-Frankivsk region:
The wind farm construction project is an important step towards energy independence and sustainable development of the Ivano-Frankivsk region. Thanks to the implementation of advanced technologies and efficient use of resources, this project opens up new opportunities for local communities and contributes to the economic growth of the region.