Kostal

Kostal_

Сonstruction of a plant for the production of mechatronic products

Back

Kostal

August 6, 2024

1 minutes

The construction project of the mechatronic production plant was developed by Egis Ertle Engineering for “Kostal Ukraine” LLC. According to the project, a new plant was planned to be built on a plot of land within the boundaries of Dudarkiv village council, Boryspil district, Kyiv region.

The project included the construction of the main production areas and administrative premises:

  • plastic injection molding workshop
  • surface treatment workshop
  • circuit board surface mounting (SMT – Surface Mount Technology)
  • assembly shop
  • storage facilities
  • premises for mechanical tests and quality control
  • workshop and facilities for engineering support of the facility
  • administrative and household premises
Know more